LUIGIMAUROHAMMIES
Client Name (required)
Client Contact Number (required)
Solar Panel Amount (required)
Inverter Amount (required)
Battery Amount (required)
Rails Galvanised (required)
Rails Aluminium (required)
Powersnaps (required)
End Clamps (required)
Mid Clamps (required)
Under Tile (required)
IBR Bracket (required)
Corrugated Bracket (required)
Cliplock Bracket (required)
PV Connectors (required)
AC Cabling (required)
PV Cabling (required)
Solar Panel Installation (required)
Inverter Installation (required)
Roof Type
Trunking and Conduit (required)
Geyser Timer (required)
Client Email (required)
Job Name
Extra Information
Client Address (required)
Client Contact (required)
Combo Number (required)
Roof Type (required) Roof TileCorrugatedIBROther
Inverter Location (required)
Electric Phase (required) Single PhaseThree Phase
PV Cabling Red (required)
PV Cabling Black (required)
Earthing Cable (required)
Inverter Installation Hours (required)
Solar Panel Installation Hours (required)
Solar Panel Location(required)
How many DB Boards(required)
Cable Run Between DB Boards(required)
Trunking(required)
Bosal/Conduit (required)
Soft Start (required) Yes Soft StartNo Soft Start
Google Screen Shot (required)
Mounting Parts
6M Galvanised Rails (required)
4.2M Aluminium Rails (required)
Under Tile Brackets (required)
Ground Mounts (required)
IBR Brackets (required)
Clip Lock Brackets (required)
Corrugated/Zinc Brackets (required)
Extra image One
Extra image Three
Extra image Four